Excess SRAM Devices Buyers

Excess SRAM Devices Buyers

H1 Have Excess SRAM Inventory? Find a Practical Way to Liquidate Unused Stock
Asynchronous, synchronous, low-power and specialized SRAM devices appear in industrial controls, communications gear, embedded boards and legacy platforms. When a product line ends, a network platform is upgraded or a customer redesigns its hardware, those devices often stay on the shelf.
XIANGDA Electronics, based in Hong Kong, has purchased surplus electronic components worldwide since 2006. We buy for our own account — not as a broker or on consignment — completing 30–40 outright purchases a year from around 50 companies. Send the list of SRAM you hold from overstock, cancelled programs, engineering changes or finished projects. Offers are built from the real ordering codes, quantities, packaging state, date codes, original labels and current demand.
Contact for list submission: vicky@xdic.com.cn
Send Inquiry
Description

Xiangda Electronics (HK) Limited is one of the most reliable excess sram devices buyers and suppliers in China. We serve customers across North America, Europe, and Asia, specializing in the sourcing, purchasing, and trading of excess and surplus electronic components. Looking to offload surplus electronic inventory? Feel free to contact us!

 

Devices Within Scope

 

Asynchronous SRAM

No clocked interface. Address, chip-enable, output-enable and write-enable signals control access. Common in industrial controls and older embedded systems. → Asynchronous SRAM surplus

Synchronous SRAM

Clocked interface, often with burst support. Found in networking and communications equipment. Timing and burst behaviour differ by family. → Synchronous SRAM surplus

Low-power SRAM

Designed for low standby current. Used in battery-backed and power-sensitive designs. → Low-power SRAM surplus

Specialized families

QDR, ZBT, burst and dual-port devices used where latency or dual access matters. → QDR / ZBT SRAM surplus

Manufacturers that appear most often: Infineon, Renesas, ISSI, GSI Technology, Alliance Memory. → Infineon excess SRAM · Renesas excess SRAM · ISSI excess SRAM

One spreadsheet can hold every type above. Keep each complete ordering code on its own row.

 

What Sellers Usually Want From a Liquidation Route

 

  • A realistic price without weeks of outreach. You send one list. Each line is priced from the ordering code, quantity, packaging state, date code and current demand. No need to approach multiple buyers one by one or accept a rushed low offer simply to clear space.
  • Real clearance, not only the popular codes. EOL devices, project leftovers, small balances and multi-manufacturer lots are reviewed. The whole list is assessed and you see which lines can be taken - and at what price - before you commit. If you prefer a whole-list quote, say so when you submit.

 

Minimum Data for a First Quote

 

Manufacturer · full ordering code (organisation, access time or clock, package, voltage, temperature grade) · actual remaining quantity · date code or lot · packaging state (sealed / opened / loose) · original labels · any COC · stock location.

Opened material is described as opened. Unknown date codes stay "unknown." Photos of labels help when the marking is hard to read.

First reply on a complete list is normally 1–2 business days.

 

Payment, Verification and Confidentiality

 

Your list is used only for evaluation and discussion with you. Payment is locked before anything ships - T/T in Advance or Escrow, with method, amount, timing and the paying entity written down first; open credit is not used. On arrival, goods are checked against an inspection standard fixed in advance - packaging, labels, appearance, date code, batch, MSL, traceability - and any mismatch is documented line by line with evidence; matching lines keep the agreed price. Authenticity checks focus on original manufacturer markings, packaging consistency, plausible date codes and accompanying paperwork, and material showing clear counterfeit or heavy-rework signs is declined. Every line in your list is reviewed - mixed manufacturers and partial reels can sit in one file, and you see the accepted lines and prices before you commit anything.

 

From List to Payment

 

 

You send the file. Identity and condition are confirmed. You receive a line-by-line proposal. Payment route, amount and post-check rules are locked in writing. Goods ship against the agreed packing list, with documents travelling with the transaction.

After arrival, only documented differences from the original list can change the final amount, and only inside the rules already signed.

Next Step

Email the spreadsheet to vicky@xdic.com.cn with full ordering codes, quantities, packaging state, date codes and any label photos or COC. A line-by-line proposal or a short clarification list follows. Payment stays T/T in Advance or Escrow, terms fixed before shipment.

 

Short Answers

 

Data retention after power-off?

Standard SRAM loses data when power is removed unless the system supplies backup power.

x8 / x16 / x32?

Data-bus width or organisation. Read with the full ordering code.

QDR versus DDR DRAM?

Different technologies. Keep them separate.

SRAM and MRAM together?

List MRAM under its own codes.

Similar-model datasheet?

Useful for first identification; the label ordering code remains the reference.

 

Hot Tags: excess sram devices buyers, China, stock, sell, liquidate, offload, cash for

Send Inquiry

Send Inquiry